Skip to main content
Manufacturing

Production Management

A standard daily production entry across every plant, with shift-level approval and deep analysis on top.

Who it's for

Factories and multi-plant manufacturers — food, oils, packaging, plastics, cans and more.

The problem today

Each production line keeps its own log book. Output, downtime and waste are reported inconsistently, and comparing shifts or plants is impossible.

  • Each production line keeps its own logbook
  • Different plants use different reporting formats
  • Shift data arrives late
  • Output figures are rebuilt manually
  • Downtime and waste are recorded inconsistently
  • Comparing shifts is difficult
  • Comparing production sites is difficult
  • Unapproved entries change after review
  • Missing shifts are discovered late
  • Machine usage is not clearly visible
  • Management cannot see lost capacity quickly

What it does

Daily production entry

  • Plant, shift, production line and machine on every entry
  • Product, and operator or team where supported
  • Output, waste or scrap and the relevant production quantities

Multi-plant support

  • Several production units operate in one platform
  • Each unit keeps its own setup, products, machines and shifts where configured
  • Each unit has its own dashboard where configured

Production setup pages

  • Machines, products and sizes
  • Packing types, shifts and operators
  • Setup information standardises daily entry across plants

Shift-level approval and locking

  • Each shift can be reviewed separately
  • One shift can be approved and locked while another remains open
  • Rejected or incomplete entries remain visible for follow-up
  • Approved or locked records cannot be silently changed by unauthorised users; changes require appropriate access and follow the configured control process

Production metrics

  • Output and achievable quantity
  • Utilisation and efficiency
  • Scrap and waste
  • Calculation rules follow your configured production setup and are confirmed during implementation

Machine heatmaps and comparison views

  • Heatmaps based on recorded production activity, showing which machines are active and which are idle
  • Patterns over a selected period
  • Performance comparison views by shift, production line or team

Dashboards and deep analysis

  • Plant and shift summaries with output, efficiency, utilisation and waste or scrap
  • Period comparison across plants and shifts
  • Trends, charts and filters on the analysis pages

Missing-entry reports and exports

  • Identification of shifts that were never recorded
  • Date-range filtering, and plant or line filtering where supported
  • Excel export of the missing-entry report
  • PDF and Excel export of filtered production views and summary reports where supported

How the process works

  • 1

    Configure the production unit

    Set up plants, lines, machines, products, packing types, shifts and operators.

  • 2

    Record shift production

    Authorised staff record production output and the relevant operational values.

  • 3

    Review and lock

    The appropriate supervisor reviews and approves each shift independently.

  • 4

    Analyse performance

    Management compares output, utilisation, efficiency, waste, plants and shifts.

  • Benefits

    • Compare plants and shifts on identical, trustworthy metrics
    • See lost capacity in numbers, not anecdotes
    • Waste and scrap become visible and therefore manageable
    • Daily production reporting stops being a manual assembly job

    Why teams choose it

    • One production standard across every plant
    • Shift-level approval and locking
    • Utilisation, efficiency and scrap calculated for you
    • Missing shifts flagged automatically

    Estimated saving: ~31 hours per month of reporting, plus modelled output gains from visible utilisation

    Better utilisation visibility may support operational output improvements. No output percentage is claimed.

    Estimated — a modelled figure based on a mid-sized operation, not a measured customer result. We will rework it with your own volumes.

    The estimate depends on:

    • Number of plants, lines and shifts
    • Current reporting process
    • Consistency of production setup data
    • User adoption across supervisors and plant staff

    Frequently asked questions

    Standardise production reporting across every plant, shift, line and machine.